0 litres of clean water abstracted.
Since July 2022, the Ilmonchin water system has been running, and counting. This live estimate grows every second the borehole pumps.
Ilmonchin.
An unprotected well served both Ilmonchin School and the community with poor water quality and often contaminated. Learners frequently fell ill due to waterborne diseases. The school had few latrines, most of which were overused or full, and lacked separate facilities for boys and girls.
Water Interventions
- Borehole Drilling
- Water kiosk built & equipped (4)
- Pipeline extended (6 km)
- School water point constructed (4 drinking stations)
Sanitation Interventions
- Ilmonchin, Kemelil B, Olare
- 3 villages declared ODF
- 8 toilets constructed in schools
- 3 bathrooms constructed in schools
- 16 handwashing stations equipped in schools
Explore the site.
Pan and zoom the map, then click any point to reveal details about the infrastructure on the ground.
Legend
Click on points on the map to reveal details.
Reports & documents.
The technical and completion reports behind this site, available to download.
Ilmonchin infrastructure designs.
Infrastructure designs for the water project in Ilmonchin.
Download
Ilmonchin topographical survey report.
Topographical survey report for the water project in Ilmonchin.
Download
Ilmonchin infrastructure designs.
Infrastructure designs for the water project in Ilmonchin.
Download
Ilmonchin infrastructure designs.
Infrastructure designs for the water project in Ilmonchin.
Download
Ilmonchin infrastructure designs.
Infrastructure designs for the water project in Ilmonchin.
Download
Ilmonchin borehole completion report.
Borehole completion report for the water project in Ilmonchin.
Download








