0 litres of clean water abstracted.
Since December 2023, the Naarolong water system has been running, and counting. This live estimate grows every second the borehole pumps.
Naarolong .
Naarolong Primary School relied solely on rainwater which often ran out due to erratic rain patterns and inadequate storage. The community members relied on streams for drinking water which was often contaminated by animals. The school had inadequate sanitation facilities that did not meet the recommended toilet:pupil ratio.
Water Interventions
- Borehole Drilling
- Water kiosk built & equipped (1)
- Pipeline extended (2.5 km)
- School water point constructed (4 drinking stations)
Sanitation Interventions
- Naibor Soit, Gem, Naarolong, Ibuko, Kichakaita, Olmakau, Osagam, Olenkampi
- 8 villages declared ODF
- 15 toilets constructed in schools
- 3 bathrooms constructed in schools
- 20 handwashing stations equipped in schools
Explore the site.
Pan and zoom the map, then click any point to reveal details about the infrastructure on the ground.
Legend
Click on points on the map to reveal details.
Reports & documents.
The technical and completion reports behind this site, available to download.
Naarolong hydrogeological survey report.
Hydrogeological survey report for the water project in Naarolong .
Download
Naarolong borehole completion report.
Borehole completion report for the water project in Naarolong .
Download