0 litres of clean water abstracted.
Since December 2023, the Lepolosi water system has been running, and counting. This live estimate grows every second the borehole pumps.
Lepolosi.
The school and surrounding community relied on an unprotected spring that was quite a distance from the school. Learners had to interrupt their studies to go and collect water for use in the school. Community members had to walk for hours under the scorching sun from far away villages to collect water. The school’s facilitation facilities were in extremely poor conditions with some almost filled up and others lacking doors. Across the villages households largely practiced open defecation as none of the households in the villages surrounding the school had toilets.
Water Interventions
- Spring Protection
- Water kiosk built & equipped (1)
- Pipeline extended (5 km)
- School water point constructed (4 drinking stations)
Sanitation Interventions
- Nashumuno, Ntepes, Entashata, Lepolosi, Olokula, Olooera
- 6 villages declared ODF
- 11 toilets constructed in schools
- 3 bathrooms constructed in schools
- 20 handwashing stations equipped in schools
Explore the site.
Pan and zoom the map, then click any point to reveal details about the infrastructure on the ground.
Legend
Click on points on the map to reveal details.
Reports & documents.
The technical and completion reports behind this site, available to download.
Lepolosi hydrogeological survey report.
Hydrogeological survey report for the water project in Lepolosi.
Download
Lepolosi water quality analysis report.
Water quality analysis report for the water project in Lepolosi.
Download










