0 litres of clean water abstracted.
Since December 2023, the Isintin water system has been running, and counting. This live estimate grows every second the borehole pumps.
Isintin.
Isintin relied on a water pan that was unprotected and shared with livestock. During dry spells water was scarce leaving the community and the school exposed to severe water insecurity. Sanitation and hygiene access and practices were limited in both the school and community with less than 1% of the households having toilets.
Water Interventions
- Borehole Drilling
- Water kiosk built & equipped (1)
- Pipeline extended (7 km)
- School water point constructed (4 drinking stations)
Sanitation Interventions
- Pardamat, Orpoor, Rekero, Enkupelia, Isintin
- 5 villages declared ODF
- 15 toilets constructed in schools
- 3 bathrooms constructed in schools
- 20 handwashing stations equipped in schools
Explore the site.
Pan and zoom the map, then click any point to reveal details about the infrastructure on the ground.
Legend
Click on points on the map to reveal details.
Reports & documents.
The technical and completion reports behind this site, available to download.
Isintin hydrogeological survey report.
Hydrogeological survey report for the water project in Isintin.
Download










