0 litres of clean water abstracted.
Since December 2024, the Losho water system has been running, and counting. This live estimate grows every second the borehole pumps.
Losho.
The school used an unprotected spring shared with the community and livestock. It frequently dried up or became contaminated. Sanitation was poor, with few, overused toilets and no safe facilities for girls. The lack of clean water made hygiene practices impossible to sustain.
Water Interventions
- Spring Protection
- Water kiosk built & equipped (1)
- Pipeline extended (2 km)
- School water point constructed (4 drinking stations)
Sanitation Interventions
- Entillau, Ikedisho, Losho, Enkigiri
- 4 villages declared ODF
- 15 toilets constructed in schools
- 3 bathrooms constructed in schools
- 20 handwashing stations equipped in schools
Explore the site.
Pan and zoom the map, then click any point to reveal details about the infrastructure on the ground.
Legend
Click on points on the map to reveal details.
Reports & documents.
The technical and completion reports behind this site, available to download.
Losho water quality analysis report.
Water quality analysis report for the water project in Losho.
Download
Losho hydrogeological survey report.
Hydrogeological survey report for the water project in Losho.
Download












